Funding entity Red Eléctrica de España, S.A.
The work is aimed at determining the capacitors to mitigate the transient recovery voltages in Picon-Aceca 220 and Picon-Emperador 220 power lines which will be affected by the series reactors in Picon 220 substation.
REECondesadoresLimitadoresPicon